Material Intelligence

What a useful waste report should actually tell you

Most waste reports are built to be produced rather than read. A useful one answers a small number of questions and names who acts on the answers.

co-cre8 teamco-cre8 Systems LtdPublished 4 min read
Illustrative image of an operations analyst comparing a printed waste report with a collection receipt and working notes
On this page

There is a particular kind of waste report that arrives monthly, runs to many pages, and changes nothing. It usually contains a recycling rate, a tonnage trend and a pie chart. Everyone reads the headline percentage and nobody acts, because nothing in the document identifies a decision.

Here is what a report has to contain before it becomes useful.

Measured or estimated, on every line

A great deal of waste data is derived from container volumes and assumed densities rather than weighed. That is often unavoidable, and it is entirely acceptable provided it is declared.

What is not acceptable is presenting estimated and weighed figures in the same column with no distinction. Mark each figure, state the conversion factor used for estimates, and note when a factor last changed. Trend analysis across a period where the factor changed silently is worthless.

Consistent methods make periods more comparable, but a consistent estimate is not a measurement. Densities and composition vary between months, sites and seasons, so a movement in an estimated figure may reflect a real change or a change in what was in the container. Before concluding that performance has moved, check the inputs behind the figure and corroborate the change against something else: a weighbridge ticket, a composition check, a change in activity on site.

Separate recycling from other recovery

Recycling is itself a form of recovery in law, so the useful distinction is between recycling and other recovery, principally energy recovery. They are different outcomes with different costs, different carbon profiles and different exposure to future policy, and combining them into a single diversion figure hides the movement an organisation usually wants to track.

Report recycling and other recovery separately, alongside landfill, and show the split by material rather than only in total.

Show the failures

Contaminated or rejected loads are among the most informative data in a report, and among the easiest to leave out. A load downgraded at the receiving facility did not achieve the outcome recorded on the collection note, and knowing which site, which stream and which shift produced it is directly actionable.

The same applies to service failures: missed collections, overflowing containers, unscheduled lifts. They are operational symptoms with a cost attached.

The minimum useful contents

  • A stable baseline period that does not move between reports, with any restatement flagged.
  • Tonnage by material and by site, with measured and estimated figures distinguished.
  • Recycling, other recovery such as energy recovery, and landfill shown separately.
  • Contamination events, rejected loads and service exceptions, with site and date.
  • Cost alongside tonnage, including additional charges, so the financial and material pictures are read together.
  • A short list of exceptions requiring action, each with a named owner and a date.

Comparability beats precision

A useful report needs both credible figures and comparable methods. Consistent estimates can help identify changes worth investigating, but density, composition and activity can shift. Corroborate the movement before concluding that performance improved or deteriorated, and document any change in method.

Fix the method, document it, and change it deliberately with a restated history when you do.

A note on dashboards

Reporting systems, ours included, only ever reflect the quality of the underlying operational data. We would rather describe what a report should contain than show a screen and imply the data problem is solved by software. If the weights are estimated and the destinations are unverified, presenting them attractively does not improve them.

Continue from here

Related reading

Start here

Have a similar challenge?

Our insights come from the work we do. If something you've read reflects a challenge within your own organisation, we'd be happy to discuss it.